|
South Haven Public Schools |
|
Request for Proposal |
|
Allowable Contract Date: January 19, 2010 |
South Haven Public Schools
554 Green St.
South Haven, MI 49090
Phone: (269) 637-0529
Fax: (269) 637-3025
Important Notes:
The district reserves the right to accept or reject any or all quotations.

Internal Connections - For Baseline Middle School, Maple Grove Elementary School, and North Shore Elementary School
North Shore Elementary School
Network Upgrades (Fast Ethernet to the Desktop)
Minimum of 1 3Com 4800G 24-port 1000Base-X (SFP) with 8-port shared 10/100/10000Base-T or equivalent
Minimum of 1 3Com 4800G 1-port 10GBase-X (XFP) module or equivalent
Minimum of 1 3Com 10GBase-LR XFP transceiver or equivalent
Minimum of 1 3Com 4800G 150 watt redundant power supply or equivalent
Minimum of 4 3Com 4500 50-port 10/100Base-T PoE with 2-port 10/100/1000BaseT or 1000Base-X (SFP) ports or equivalent
Minimum of 4 1000B-SX SPF modules
Minimum of 4 multi-mode duplex SC to LC fiber jumper
Maple Grove Elementary School
Network Upgrades (Fast Ethernet to the Desktop)
Minimum of 1 3Com 4800G 24-port 1000Base-X (SFP) with 8-port shared 10/100/10000Base-T or equivalent
Minimum of 1 3Com 4800G 1-port 10GBase-X (XFP) module or equivalent
Minimum of 1 3Com 10GBase-LR XFP transceiver or equivalent
Minimum of 1 3Com 4800G 150 watt redundant power supply or equivalent
Minimum of 3 3Com 4500 50-port 10/100Base-T PoE with 2-port 10/100/1000BaseT or 1000Base-X (SFP) ports or equivalent
Minimum of 4 1000B-SX SPF modules
Minimum of 2 multi-mode duplex SC to LC fiber jumper
Baseline Middle School
Network Upgrades (Gigabit to the Desktop)
Minimum of 1 3Com 4800G 24-port 1000Base-X (SFP) with 8-port shared 10/100/10000Base-T or equivalent
Minimum of 1 3Com 4800G 1-port 10GBase-X (XFP) module or equivalent
Minimum of 1 3Com 10GBase-LR XFP transceiver or equivalent
Minimum of 1 3Com 4800G 150 watt redundant power supply or equivalent
Minimum of 6 3Com 4500G 48-port 10/100/1000Base-T PoE with 4-port shared 1000Base-X ports or equivalent
Minimum of 1 3Com 4500G 24-port 10/100/1000Base-T Non-PoE with 4-port shared 1000Base-X (SFP) ports or equivalent
Minimum of 12 1000b-sx modules
Minimum of 12 single-mode duplex fiber jumpers LC to SC, 1 meter long
Wireless Upgrades (Add 802.11 a/b/g/n coverage)
Minimum of 1 3Com WX series controller 24-MAP upgrade license or equivalent for each building (North Shore, Maple Grove, Baseline)
Minimum of 13 3Com WX series AP3950 802.11 a/b/g/n "fit" access point or equivalent for North Shore School
Minimum of 13 3Com WX series AP3950 802.11 a/b/g/n "fit" access point or equivalent for Maple Grove
Minimum of 13 3Com WX series AP3950 802.11 a/b/g/n "fit" access point or equivalent for Baseline School
Minimum of 1 Aruba 3600 multi-service mobility controller (with 64 AP licenses) or equivalent for Baseline School
Minimum of 1 Aruba NBD advanced replacement and software updates for 3600-64AOS-STD or equivalent for Baseline School
Software Maintenance
Minimum of 1 Aruba 512 user policy enforcement firewall license or equivalent
Minimum of 1 Aruba software support services for LIC-PEF-128 or equivalent for Baseline School
Minimum of 1 Aruba software support services for LIC-PEF-64 or equivalent for North Shore School
Minimum of 1 Aruba software support services for LIC-PEF-128 or equivalent for Maple Grove School
Minimum of 13 Aruba AP-124 802.11 a/n or b/g/n access points or equivalent for North Shore School
Minimum of 13 Aruba AP-124 802.11 a/n or b/g/n access points or equivalent for Maple Grove School
Minimum of 22 Aruba AP-124 802.11 a/n or b/g/n access points or equivalent for Baseline School
Network Management IMC standard 100-node
All hardware specifications above are minimum. It is expected that wiring/components/software will meet industry standards and current versions at the time of installation. Please contact Steve Miles (stevem@shps.org) for details.
Please contact Steve Miles (stevem@shps.org) to arrange a time for a building site survey. (NOTE: Surveys must be conducted before or after school.)
Bid Evaluation
Although the cost of the product/service is of primary concern, the ability to accommodate growth and change and the total cost of operation (TCO) within the district are, in many ways, more important. Do not assume the lowest bid will be awarded the project.
To achieve this goal, bids will be evaluated on several factors.
Prices/charges
Prior experience
Understanding of needs
Financial stability
Personnel qualifications
Comply with the spirit of the district's long range technology plan
Compatibility with district hardware/software standards as set forth within district's long range technology plan
Provide lower long-term cost of ownership
Ability to upgrade and adapt to technological advances
Completeness of response and adherence to bid specifications
Summary of project implementation plan
Capability of the bidder to successfully complete the installation within the required timeframe.