|
Paw Paw Public Schools |
|
Request for Proposal |
|
Allowable Contract Date: November 26, 2009 |
Paw Paw Public Schools
119 Johnson Street
Paw Paw, MI 49079
Phone: (269) 657-8808
Fax: (269) 657-5011
Important Notes:
The district reserves the right to accept or reject any or all quotations.
Telephone Service
Local Dial Tone Service (DID)
# of Buildings = 8
# of Lines = 18-25
# of Extensions = 188 -195
DID lines = 140-200
Minimum of 1 PRI
PRI Circuit, if cost effective and available
Minimum of 1 for the district
Voice-over IP
Must have direct fiber connection to the district
If cost effective and available
Cellular Service
# of Cell Phones = 23-30
# of pooled minutes = 6,000-8,000, if cost effective
Fiber Lease
Install fiber connection from the school district to the Van Buren ISD and from the school district to Mattawan Consolidated School. It is the intention of the district to lease fiber in the most cost effective manner -- either from a Telco provider OR from an Internet Service provider. Please note that a wireless solution will not be accepted.
Paw Paw Schools to Van Buren ISD - 313 W. Michigan Avenue, Paw Paw, MI. to 490 South Paw Paw Street, Lawrence, MI.
Paw Paw Schools to Mattawan Consolidated School - 313 W. Michigan Avenue, Paw Paw, MI. to 56720 Murray St., Mattawan, MI.
Bids will not be accepted from wireless providers as a solution for the connectivity between Paw Paw and Mattawan.
Telecommunications add-alternates for a multi-year contract may be considered for each of the telecommunication services described above.
Alternate 1: Telephone and/or cellular service as described above with 2-year contract.
Alternate 2: Telephone and/or cellular service as described above with 3-year contract.
Telephone service includes, but is not limited to, those items/components that are USF eligible. Any additional telephone service not covered by USF eligibility, must be itemized and quoted separately. Please contact Tony Nuismer (januismer@ppps.org) for details.

Internet Access
Voice-over IP
Must have direct fiber connection to the district
If cost effective and available
Fiber Lease
Install fiber connection from the school district to the Van Buren ISD and from the school district to Mattawan Consolidated School. It is the intention of the district to lease fiber in the most cost effective manner -- either from a Telco provider OR from an Internet Service provider. Please note that a wireless solution will not be accepted.
Paw Paw Schools to Van Buren ISD - 313 W. Michigan Avenue, Paw Paw, MI. to 490 South Paw Paw Street, Lawrence, MI.
Paw Paw Schools to Mattawan Consolidated School - 313 W. Michigan Avenue, Paw Paw, MI. to 56720 Murray St., Mattawan, MI.
Bids will not be accepted from wireless providers as a solution for the connectivity between Paw Paw and Mattawan.
Internet access includes, but is not limited to, those items/components that are USF eligible. Any additional service not covered by USF eligibility must be itemized and quoted separately. Please refer to the 2009 USF Eligible Services List. It is the intent of the district to obtain the highest value at the most reasonable price.
Add-alternates for a multi-year contract may be considered.
Alternate 1: Internet access as described above with 2-year contract.
Alternate 2: Internet access as described above with 3-year contract.
Please contact Tony Nuismer (januismer@ppps.org) for details.
Bid Evaluation
Although the cost of the product/service is of primary concern, the ability to accommodate growth and change and the total cost of operation (TCO) within the district are, in many ways, more important. Do not assume the lowest bid will be awarded the project.
To achieve this goal, bids will be evaluated on several factors.
Prices/charges
Prior experience
Understanding of needs
Financial stability
Personnel qualifications
Comply with the spirit of the district's long range technology plan
Compatibility with district hardware/software standards as set forth within district's long range technology plan
Provide lower long-term cost of ownership
Ability to upgrade and adapt to technological advances
Completeness of response and adherence to bid specifications
Summary of project implementation plan
Capability of the bidder to successfully complete the installation within the required timeframe.