|
Niles Community Schools |
|
Request for Proposal |
|
Allowable Contract Date: January 26, 2010 |
111 Spruce St.
Niles, MI 49120
Phone: (269) 683-0734
Fax: (269) 684-6337
Important Notes:
The district reserves the right to accept or reject any or all quotations.

Internal Connections - For all school buildings
Cat6 cabling for all school buildings
A walk through is necessary to determine the scope of work.
All installation and configuration charges should be included.
Network switches for all school buildings
A walk through is necessary to determine the amount of network switches for each building.
All installation and configuration charges should be included.
Wireless switches for all school buildings
A walk through is necessary to determine the amount of wireless switches for each building.
All installation and configuration charges should be included.
UPS for all school buildings
A walk through is necessary to determine the amount of UPSs for each building.
All installation and configuration charges should be included.
Firewall for the district
All installation and configuration charges should be included.
Upgrade or replace existing system to Voice-over IP, if more cost-effective. The district is looking for the most cost effective solution to its telephony needs. The proposal should include a comparison of the proposed solution with other existing analog/digital/IP based systems.
Basic Maintenance
Maintenance contract for existing Telco/LAN infrastructure (test, replace, repair) cable and/or electronics. Includes, but is not limited to, all wireless access points, switches, servers, and the phone system for the district.
All hardware specifications above are minimum. It is expected that wiring/components/software will meet industry standards and current versions at the time of installation. Please contact David DelMuro (david.delmuro@nilesschools.org) for details.
Please contact David DelMuro (david.delmuro@nilesschools.org) to arrange a time for a building site survey. (NOTE: Surveys must be conducted before or after school.)
Bid Evaluation
Although the cost of the product/service is of primary concern, the ability to accommodate growth and change and the total cost of operation (TCO) within the district are, in many ways, more important. Do not assume the lowest bid will be awarded the project.
To achieve this goal, bids will be evaluated on several factors.
Prices/charges
Prior experience
Understanding of needs
Financial stability
Personnel qualifications
Comply with the spirit of the district's long range technology plan
Compatibility with district hardware/software standards as set forth within district's long range technology plan
Provide lower long-term cost of ownership
Ability to upgrade and adapt to technological advances
Completeness of response and adherence to bid specifications
Summary of project implementation plan
Capability of the bidder to successfully complete the installation within the required timeframe.