|
Delton District Library |
|
Request for Proposal |
|
Allowable Contract Date: October 15, 2009 |
Delton District Library
330 N. Grove St.
Delton, MI 49046
Phone: (269) 623-8040
Fax: (269) 623-6740
Important Notes:
The library reserves the right to accept or reject any or all quotations.
Telephone Service
Telecommunications add-alternates for a multi-year contract may be considered for each of the telecommunication services described above.
Alternate 1: Telephone service as described above with 2-year contract.
Alternate 2: Telephone service as described above with 3-year contract.
Telephone service includes, but is not limited to, those items/components that are USF eligible. Any additional telephone service not covered by USF eligibility, must be itemized and quoted separately. Please contact Cheryl Bower (deltonlib@mei.net) for details.

Internet Access
Minimum 6.0MB, 1MB upload DSL Internet connection or comparable solution.
Internet access includes, but is not limited to, those items/components that are USF eligible. Any additional service not covered by USF eligibility must be itemized and quoted separately. Please refer to the 2009 USF Eligible Services List. It is the intent of the library to obtain the highest value at the most reasonable price.
Add-alternates for a multi-year contract may be considered.
Alternate 1: Internet access as described above with 2-year contract.
Alternate 2: Internet access as described above with 3-year contract.
Please contact Cheryl Bower (deltonlib@mei.net) for details.
Bid Evaluation
Although the cost of the product/service is of primary concern, the ability to accommodate growth and change and the total cost of operation (TCO) within the library are, in many ways, more important. Do not assume the lowest bid will be awarded the project.
To achieve this goal, bids will be evaluated on several factors.
Prices/charges
Prior experience
Understanding of needs
Financial stability
Personnel qualifications
Comply with the spirit of the library's long range technology plan
Compatibility with library hardware/software standards as set forth within library's long range technology plan
Provide lower long-term cost of ownership
Ability to upgrade and adapt to technological advances
Completeness of response and adherence to bid specifications
Summary of project implementation plan
Capability of the bidder to successfully complete the installation within the required timeframe.